
Engineering Batches: The Run That Can Save Your GMP Campaign
An engineering batch can be difficult to defend internally. It uses manufacturing time. It consumes raw materials. And it costs money. Moreover

An engineering batch can be difficult to defend internally. It uses manufacturing time. It consumes raw materials. And it costs money. Moreover

There is a point in almost every biologics program when process development starts raising an uncomfortable question: are we still improving the

Platform processes have transformed biologics manufacturing. They save development time, reduce uncertainty and allow CDMOs to build experience around repeatable workflows. For

There is nothing inherently wrong with manufacturing Drug Substance at one site and filling Drug Product somewhere else. The biopharma industry has

Bioreactor capacity is one of the first numbers biotech teams see when comparing CDMOs. 200 L. 500 L. 2,000 L. Sometimes considerably

A biologics CDMO RFP should do more than collect capabilities, timelines and prices. At late stage, the purpose of the request is to reveal

Choosing a strain or cell line is one of those decisions that looks technical at first, but can become surprisingly strategic later.

A biologic can be ready for GMP manufacturing in the process sense and still not be ready in the analytical sense becasue the analytical package is poor defined. This is one of the most common late-stage bottlenecks in B…

Changing CDMO late in development may sometimes be necessary. Capacity may no longer fit the program. Timelines may have shifted. The original partner may not offer GMP manufacturing, integrated analytics, fill-finish or…

Antibody manufacturing decisions are often reduced to two variables: capacity and price. While both are important, they rarely determine the true success of a program. Antibody Manufacturing Is a System, Not a Service On…